EV charger installation, without the surprises
Standard installation included with every Cord Zero, backed by our no quibble money-back guarantee.
Installation, handled from survey to switch-on
Buy your charger with standard installation included, then we check your home. If it needs extra work you'd rather not pay for, you get a full refund. No quibble.
Quick home survey
A few photos from your phone, checked by our own team before installation day.
Installed in 2-3 weeks
By a Which? endorsed electrician, with the paperwork done for you: we complete your DNO submission, a legal requirement.
Charge from 7p/kWh
Tested and connected to the Cord app before we leave, with your electrical certificate to follow.
Current installation lead times
We complete most installations in 2-3 weeks, however this is dependent on your home survey and installer availability in your area. See the table below for current lead times by area. During public holidays such as Easter & Christmas installations may take longer. In some instances additional electrical work is required by your DNO (Distribution Network Operator) which is out of our control and may delay your installation.
| Region | Lead time |
|---|---|
| East Midlands | ~2 weeks |
| West Midlands | ~2 weeks |
| North West | ~3 weeks |
| North East | ~3 weeks |
| South East | ~2-3 weeks |
| Region | Lead time |
|---|---|
| South West | ~3-4 weeks |
| Wales - South | ~2 weeks |
| Wales - North | ~3-4 weeks |
| Scotland | ~4-5 weeks |
| Northern Ireland | ~2 weeks |
“We use only high quality, fully vetted and trained installers, and we complete all the legal pre and post installation applications and paperwork for you. You choose your preferred installation date at checkout.”
The Cord installation team
What's included, and what costs extra
Around 9 in 10 UK homes need nothing beyond the standard installation. Here's exactly what that covers, and what might cost extra.
Included with every installation
- Virtual home survey (photos from your phone)
- Up to 15m of cabling from your electricity meter to the charger
- Wall mounting, cable clipped to the wall, one wall penetration
- Up to 3m of internal trunking
- Up to 3 hours of labour
- Surge protection device (worth £69)
- CT clamp installation
- All the legal paperwork: DNO submission and electrical certificates
- Full electrical testing, and connection to the Cord app
What costs extra (we'll always tell you first)
- Gas or water bonding upgrade: most homes have this in place, however if it's missing or if you're in an older property it may need installing or upgrading. It's a legal requirement (as well as for your safety)
- Cabling beyond 15m, trunking beyond 3m, or labour beyond 3 hours
- Mounting on a post rather than a wall
- Trenching or groundworks (quoted individually)
- DNO (distribution network operator) works, e.g. a main fuse upgrade: usually free, and carried out by your network operator
- In-person surveys, and complex solar or battery integration
None of these mean you can't have a charger. They just need a conversation first, and our guarantee means you can always change your mind. Not sure where your home lands? Use the checker below.
Our no quibble money-back guarantee
The whole point of your survey and our pre-installation checks is that there are no on-the-day surprises. If they show your home needs extra work, we'll explain it and agree the cost with you before your installation. And if you'd rather not go ahead? Full refund. No quibble, no awkward conversation.
From survey to switched on
Survey
A few photos from your phone. We help you every step of the way: if anything needs clarifying, we'll call you or hop on a video call.
We check everything's standard
Your charger and standard installation are already paid for. For 9 in 10 homes the survey simply confirms it; if there is extra work needed, it's explained and agreed with you first.
Paperwork, done for you
We complete your DNO submission for you: it's a legal requirement, and we take care of it. Your electrical certificate follows after installation.
Installation day
Up to 3 hours on site, with power off for up to 60 minutes. We test, certify and tidy up.
Before we leave
We connect your charger to the Cord app and show you how it works. UK support is a call away after that.
Wondering when we could fit yours? See for your region: most homes are done in 2 to 3 weeks, and you choose your preferred date at checkout.
Choose your Cord Zero
Meet the Cord Zero: our 7.4kW smart charger, designed in the UK. Every installed price includes the standard installation above, a 5 year warranty and the Cord app, and every model is also available unit only if you'd rather arrange your own installation.
Prefer to arrange installation yourself?
No problem: every Cord Zero is available unit only, with the same 5 year warranty. Here's how that works.
Buy the unit only
Untethered from £479, tethered from £559, in black or white. Delivered free, next working day.
Book your electrician
Choose one qualified in EV charger installation. They'll install the charger on a dedicated circuit, notify your DNO and certify the work.
Connect and charge
Once installed and certified, connect the charger to the Cord app and you're away, with UK support whenever you need it.
Our honest advice: going unit only makes sense if you already have an electrician you trust or you're doing a bigger electrical project anyway. Either way your charger carries the full 5 year warranty. Our installed price adds the survey, the paperwork, certification, app setup and the no quibble guarantee above.The Cord team
Installation questions, answered
Your DNO (Distribution Network Operator) is the company that owns and runs the local electricity network: the cables and substations between the grid and your meter. They're not your energy supplier. Before a charger is installed, the DNO needs to know about it, and sometimes to approve it, because a 7.4kW charger is a significant new load on your supply. We handle the submission and any approval for you as part of the included paperwork. For most homes it's a formality; occasionally the DNO asks for your main fuse to be upgraded first, which is their work to carry out and usually free of charge.
The charger mounted on a wall within 15m of your electricity meter, with the cable clipped along walls (one wall penetration and up to 3m of internal trunking), up to 3 hours of labour, a surge protection device, CT clamp installation, all testing, certification and paperwork, and connection to the Cord app. Use the checker further up this page for a quick read on your own home.
Your survey and our pre-installation checks pick it up before the day, we explain what's needed, and we agree the cost with you before your installation: no on-the-day surprises. If you'd rather not go ahead, our no quibble guarantee means a full refund.
Earth bonding connects your gas and water pipework to your electrical earth: it's a legal requirement for installing an EV charger, as well as for your safety. Most homes have it in place, however if it's missing or if you're in an older property it may need installing or upgrading. It's easy to check yourself: look for a green-and-yellow cable clamped to the pipework near your gas and water meters. If needed, our installers can fit it as part of your installation, quoted and agreed first.
From survey to switch-on is typically 2 to 3 weeks in most regions (see the lead times above for yours), and you choose your preferred installation date when you order. The installation itself takes up to 3 hours, with your power off for up to 60 minutes of that.
Your phone is all you need: a photo of your electricity meter and consumer unit, the spot where you'd like the charger, and the route between the two, plus a note of your wifi signal near the charger location. We'll guide you through it, and if anything needs clarifying we'll call you or hop on a video call.
Just make sure there's clear access to your electricity meter, your consumer unit and the wall where the charger is going. Expect the power to be off for up to 60 minutes while we connect the new circuit. Before we leave, your electrician connects the charger to the Cord app and shows you how it all works.
Yes. Every Cord Zero is available unit only, with the same 5 year warranty. You'll need an electrician qualified in EV charger installation to fit it on a dedicated circuit, notify your DNO and certify the work: see the section above for how it works.
Usually not. Some homes require a main fuse upgrade or a modification of the incoming power supply into the property before adding a 7.4kW charger. Your survey spots this early, your DNO carries out the work, and it's usually free of charge. If it ever makes the job more than you signed up for, the no quibble guarantee applies as always.


